Architect with 20+ years of design, construction and building information management (BIM) experience on projects in America and Australia. Demonstrated ability to develop, analyze, model, and construct design projects. specialist on CAD/BIM/GIS modeling/analysis focused on the design development of construction projects.
Qualifications & Affiliations
- 2021 Leader as Coach Training, Annette Gray, Australia
- 2021 Certificate IV in Training and Assessment, Australia
- 2015 Advanced Diploma of Management, Australian Pacific College, Australia.
- 2014 Diploma of Management, Australian Pacific College, Australia.
- 2013 Advanced Diploma of Marketing, Australian Pacific College, Australia.
- 2011 Diploma in Innovation Management, University Alberto Hurtado, Chile.
- 2007 Diploma in Conservation and Restoration of Heritage, University Católica, Chile.
- 2006 Architect (Maximum Distinction), University Finis Terrae, Chile.
- 2005 Bachelor of Architecture, University Finis Terrae, Chile.
Recent Projects
- Sydney Metro West – EIS3 (EDS, Sydney Metro) – Link
- Clyde Resignalling (Aurecon, TfNSW)
- Westmead Enabling Works (Sydney Metro)
- North Strathfield Enabling Works (Sydney Metro)
- Sydney Metro West – EIS2
- Fast Rail (WSP, TfNSW)
- Kiama to Bomaderry Project (TfNSW) – Link
- Cross River Rail, Mayne Yard (CRRDA, Queensland Rail)
- Cross River Rail, Northern Portal (CRRDA, Queensland Rail)
- Cross River Rail, Southern Portal (CRRDA, Queensland Rail)
- Epping to Thornleigh Third Track (TfNSW) – Link
- Parramatta Turnback Project
- South Eveleigh Intercity Service Centre
- Hornsby Planning Services, Hornsby Junction Remodelling
– Primavera P6 Program
– Risk Analysis - Regional Stabling Options
- Western Sydney Rail Upgrade
- Technical Advisor Support for Substations, Guildford Substation
- Lower Main North Quadruplication Lite (LMNQL) (Geodata, NSRU Alliance) – Link
- Clyde Junction Project Stage 12 Project at Auburn NSW.
- Clyde Junction Project Stage 13 at Clyde and Granville NSW.
- North Strathfield Rail Underpass Project.
- Arncliffe Pedestrian Access Project
- Granville to Westmead Resignalling
- Northern Sydney Freight Corridor Program – Stage 2
- Lower Main North Quadruplication Lite – Up Relief Extension
- Sydney Rail Futures (SRF) Stage 2 (2019-2025 Projects)
- Northern Sydney Freight Corridor Program.
Rhodes to West Ryde Quadruplication, Project definition design – Link
Berowra to Hawkesbury River Triplication, Project definition design.
Services Provided:
• Construction Staging Coordinator assisting with the production on Constructability Reports and Construction Staging Diagrams as part of the TfNSW Concept Design;
• Compilation of Sydney Trains Possession Configuration and Possession Calendar information required for detailed project review at Construction Staging Workshops; and
• Assisted with submission of Electrical Operating Diagram Advice of Alteration(s).
Strengths & Skills
• Ability to rationalise complex problems using past experience and the skills of the team around me.
• Demonstrated ability to develop, analyse, model and construct design projects.
• Specialist on CAD/BIM modelling/analysis focused in design development of construction projects.
Experience
Constructability advisor 2013-Present
- Construction Advisor. Staging Coordinator assisting with the production on Constructability Reports and responsible for Construction Staging Diagrams; Compilation of Sydney Trains Possession Configuration and Possession Calendar information required for detailed project review at Construction Staging Workshops.
- Arncliffe Station Precinct Accessibility Upgrade (ID:1080),Project Value: $770m ,Contract value $164k Responsible for the production of staging diagrams for the Precinct Accessibility Upgrade, considering works in all platforms at Arncliffe Station, detailed into 7 possessions, 75 weeks of work. This project is part of the Transport Access Program a NSW Government initiative to deliver accessible, modern, secure and integrated transport infrastructure.
- Auburn to Westmead Possession Planning (ID:1080)
- Responsible for the production of staging diagrams for Possession Planning, considering 7.2KM of trackwork between 18.050KM (Auburn) and 25.271KM (Westmead), detailed into 30 stages, 61 weeks of planning and five different projects/entities: Auburn Junction Project, Clyde Junction Project, Westmead to Granville project, OHW Modernisation and Sydney trains works.
- Sydney Rail Futures (SRF) Stage 2 (2019-2025 Projects) (ID1071)
- Responsible for the production of staging diagrams for the Westmead to Granville Signaling Upgrade, considering 3.5KM of trackwork (22.533KM to 25.816kM), detailed into 12 possessions, 35 weeks of work and 8 different configurations.
Lower Main Quadruplication Lite, Up Relief Extension.
Responsible for the production of staging diagrams for the Lower main Quadruplication Lite, Up Relief Extension Project, considering 5.1KM of trackwork (12.245KM to 17.350KM), along three stations, detailed into 8 possessions, 129 weeks of work.
- Northern Sydney Freight Corridor Program, Transport Project Division, Project Value: +$1.4b
– Responsible for the production of staging diagrams for the Rhodes to West Ryde Quadruplication, Project Definition design, considering 3.8KM of trackwork (15.670KM to 19.485KM), along three stations, detailed into 13 possessions / 193 weeks of work.
– Responsible for the production of staging diagrams for the Berowra to Hawkesbury River Triplication, considering 13.2KM of trackwork (44.258.KM to 57.397KM), detailed into 12 possessions, 192 weeks of work. - North Strathfield to Epping 1500V Sectioning Program (ID:131127)
Assisted with submission of Electrical Operating Diagram Advice of Alteration(s), related to north and central district. - Clyde Junction Project LGCUP Stage 12 / 13, Transport Project Division, $150m
Responsible for the poduction of staging diagrams for Stage 12 (Signals and communications, OHW and Electrical works) and Stage 13 (Track, Civil and interface works) - Project Manager, INSESA INGENIERIA, Chile 2005-Present
Undertaken work for various clients, including programme estimates, stage, develop designs and construction for diverse projects along America: Dominican Republic (380Tn); New Caledonia (460 Tn); Chile (290Tn). - R+D manager, OXER ENGINEERING, Australia- Chile 2005-Present
Design and manufacture a range of Hardware devices for diverse applications, including many Arduino- compatible boards with their accessories and automation. Definition and staging coordination of 2D/3D/4D CAD and BIM modelling software standards.
Links
• www.feliperamirez.info